So I know you've already seen the final pictures of the bathroom, but it took us (Clint and Lindsay) a lot of work to get there, so I thought it'd be a good idea to share some photos from that.
So the floor was rotten because the genius who decided to stick the toilet where it is decided he should cut a beam and not support it. What happened as a result is that the toilet leaked whenever a great deal of weight was put on it. We solved that by bracing it and adding a support in the crawlspace for the end of the hanging beam.
This is a photo Clint standing on the remaining beams and measuring sheetrock.
Floor! Our brand new piece of subfloor, and sheetrock over the slats of course.
Not the final product, but some more sheetrock, a tub and updated plumbing!
No comments:
Post a Comment